________________________________________________________________________________________________
2024
- Exhibited Daishin Industrial brazing technology at the Japan International Welding Show.
(Osaka)
________________________________________________________________________________________________
2022
- Exhibited Daishin Industrial brazing technology at the Japan International Welding Show (Tokyo).
________________________________________________________________________________________________
2020
- Relocation of Nagoya Sales Office.
- Installed demo/test scale "Return Bend Automatic Brazing Machine" at Daishin Industrial (USA).
________________________________________________________________________________________________
2019
- Featured in "Welding News" (October 22, 2019 Edition)
- Relocation of Tokyo Sales Office.
________________________________________________________________________________________________
2018
- Exhibited Daishin Industrial brazing technology at the Japan International Welding Show (Tokyo).
________________________________________________________________________________________________
2017
- Exhibited Daishin Industrial brazing technology at the 2017 Welding Forum in West Japan.
- Featured in "Welding News" (August 8, 2017 Edition)
________________________________________________________________________________________________
2016
- Exhibited Daishin Industrial brazing technology at the Japan International Welding Show (Osaka).
________________________________________________________________________________________________
2013
- Completion of fifth "All-Aluminum Heat Exchanger Automatic Brazing Machine" to a major North American air
conditioning manufacturer.
- Relocation of Tokyo and Nagoya Sales Office.
________________________________________________________________________________________________ 2012
- Exhibited METALEX 2012 (Thailand).
- Exhibited Daishin Industrial brazing technology at the Japan International Welding Show (Osaka).
________________________________________________________________________________________________
2011
- Completion of fourth "All-Aluminum Heat Exchanger Automatic Brazing Machine" to a major North American air
conditioning manufacturer.
________________________________________________________________________________________________
2009
- Commenced manufacturing of low-cost automatic brazing systems.
- Exhibited Daishin Indsutrial Brazing Technooogy at the 2009 AHR Expo in Chicago, IL, USA.
________________________________________________________________________________________________
2004
- Designed, built and installed the first fully-automated aluminum return bend brazing system in USA.
- Exhibited Daishin Industrial Brazing Technology at the Japan International Welding Show.
- Exhibited Daishin Industrial Ozone Equipment at FOOMA Japan 2004.
________________________________________________________________________________________________
2003
- Received an international Patent for the V. Auto Tank automatic vapour flux.
________________________________________________________________________________________________
2001
- Established DAISHIN INDUSTRIAL (U.S.A.) CO., INC. in Dublin, Ohio, U.S.A.
- Introduced the revolutionary Daishin Soft Feeder (DSF) Wire Feeding System for improved brazing repeatability.
- Introduced the temperature-based Optimum Heating System (OHS) for improved brazing repeatability.
________________________________________________________________________________________________
2000
- Exhibited Daishin Industrial brazing technology at the Japan International Welding Show.
- Commenced marketing of Ozone equipment "My Friend" series.
- Commenced marketing of V. Auto Tank automatic vapor flux system for use in manual and automated brazing.
________________________________________________________________________________________________
1999
- Commenced manufacturing and marketing of aluminum flux cored brazing wire AL-FLO.
- Ozone department established in Osaka, Japan headquarters.
________________________________________________________________________________________________
1998
- Received an international patent for the FLOTRON Intelligent Gas Controller&trade.
- Commenced manufacturing and marketing of DE-2000 Series manual brazing gas saver with gas flow rate control.
________________________________________________________________________________________________
1996
- Commenced manufacturing and marketing of DE-SAVER Series gas saver with solenoid valve control.
________________________________________________________________________________________________
1994
- Introduced the revolutionary FLOTRON Intelligent Gas Controller&trade for precise control of gas flow rates and
ratios for unmatched process repeatability.
________________________________________________________________________________________________
1992
- New headquarters building constructed in Osaka, Japan.
________________________________________________________________________________________________
1990
- Commenced marketing of machine base isolator produced by Lorant Group Inc. of U.S.A.
________________________________________________________________________________________________
1989
- Plasma arc welder installed in Factory No. 2.
________________________________________________________________________________________________
1988
- Machining center added to Factory No. 2.
________________________________________________________________________________________________
1986
- Commenced manufacturing and marketing of transfer machines for factory automation.
________________________________________________________________________________________________
1985
- CAD introduced.
- Commenced manufacturing and marketing of brazing robots.
________________________________________________________________________________________________
1984
- Factory No. 2 constructed in Kita-Okajima, Taishou-Ku, Osaka, Japan.
________________________________________________________________________________________________
1980
- In-house trading department established.
________________________________________________________________________________________________
1979
- Nagoya Sales Office established.
________________________________________________________________________________________________
1977
- Tokyo Sales Office established.
________________________________________________________________________________________________
1969
- Hikone Factory constructed.
________________________________________________________________________________________________
1968
- Hozono Factory constructed.
________________________________________________________________________________________________
1967
- Commenced hard facing welding operations.
________________________________________________________________________________________________
1964
- Commenced manufacturing and marketing of Daishin Bronze-high grade brass brazing rod.
________________________________________________________________________________________________
1962
- Commenced manufacturing and marketing of fully automatic gas brazing machines for the HVAC and automotive
industries.
________________________________________________________________________________________________
1961
- Received patent for Vapour Flux Brazing.
________________________________________________________________________________________________
1960
- Daishin Industrial Co., Ltd. established in Osaka, Japan.
- Commenced manufacturing and marketing of Vapour Flux.
________________________________________________________________________________________________